- Overview
- Product Description
- Technical Information
- Detailed Photos
- Company Profile
- Our Advantages
- Packaging & Shipping
- FAQ
Basic Info.
Model NO.
4000
Material
70% PVC 30% Polyester
Color
Can Be Customized
Function
Heat Insulation, Dustproof, Windproof, Invisibility
Customized
Customized
Fireproof
Yes
Waterproof
Yes
Transport Package
30 Meters/Paper Tube
Specification
Can be customized
Trademark
YX
Origin
China
Production Capacity
50000 Meters/Month
Product Description
Item: | 40% Sunscreen Zebra Roller Blinds Fabric/Ready-made Sunscreen Zebra Roller Blinds |
Material: | Fabric: 70% PVC 30% Polyester; Ready-made: 70% PVC 30% Polyester+Aluminum alloy |
Code: | 4000 |
Width: | Can be customized |
Packing: | Fabric: 30 Meters/Paper tube; Ready-made: one blind per clear PET box,4-10 pcs/carton |
Function: | Sound Insulation, Heat Insulation, Insect Resistant, Dustproof |
Suitable for : | Living Room, Bedding Room, Bathroom ,Office, Kitchen |
MOQ: | Fabric: 100 Meters; Ready-made: 50 pcs(Mixed Sizes) |
Stock: | available |
Top/Bottom(Ready-made only): | 28/38mm Aluminum tube |
Colors: | white,black,red,yellow,blue,bron,ivory,pink, customized colors available |
Openness Factor(%) | 40% |
Composition | 30% Polyester 70% PVC |
Thickness(mm) | 0.62 |
Weight(g/m2) | 310 |
Width(m) | 1.7m-3m |
Roll Length(m) | 25-35 |
Density(ends/inch) | 18×11/82 |
Yarn Diameter(D) | 220D |
Breaking Strength(n/5cm) | 1480N×1750N |
Elongation(%) | Warp:12% Weft:30% |
Color Fastness | 8 |
Fire Resistance | NFPA701:2015 GB/T17591-2006:B1 |
UV Blockage | 60% |
Patten | PLAIN WEAVING(2×2) |
Q1: Are you manufactory or trade company?
A: We are manufacturer. Welcome to visit our factory.
Q2: How long is the sample lead time?
A: 3-7days.
Q3: How long is the production lead time?
A: Ususally 20'GP FCL, delivery in 25-31days after deposit.
Q4: How many colors available?
A: All color to your choice, as you required.
Q5: Would you produce OEM brand or design?
A: Yes, OEM design is availabl
A: We are manufacturer. Welcome to visit our factory.
Q2: How long is the sample lead time?
A: 3-7days.
Q3: How long is the production lead time?
A: Ususally 20'GP FCL, delivery in 25-31days after deposit.
Q4: How many colors available?
A: All color to your choice, as you required.
Q5: Would you produce OEM brand or design?
A: Yes, OEM design is availabl