PC200-8 Ex100 Zx210-3 Undercarriage Parts Excavator Carrier/Top Roller

Looking for top-quality PC200-8, EX100, ZX210-3 undercarriage parts? Our factory produces excavator carrier/top roller for exceptional performance and durability. Buy Now!
Request a Quote

PRODUCTS DETAILS

Basic Info.

Model NO.
PC200-8/EX100/ZX210-3
Application
Excavator
Certification
CE, ISO9001: 2000
Condition
New
Material
50mn
Colors
Black or Yellow
Finish
Smooth
Technique
Forging & Casting
Name
Factory Price Good Quality Carrier Roller
Warranty Time
2000 Hour
MOQ
2pieces
Delivery Time
Within 25 Days After Contract Established
Key Words
Carrier Roller, Top Roller, Upper Roller
Transport Package
Standard Export Fumigated Wooden Pallet
Specification
PC200-8/EX100/ZX210-3
Trademark
Dingtai
Origin
Fujian
HS Code
84314999
Production Capacity
5000 PCS Per Month

Packaging & Delivery

Package Size
150.00cm * 150.00cm * 150.00cm
Package Gross Weight
800.000kg

Product Description

Product Information

PC200-8/EX100/ZX210-3 Undercarriage Parts Excavator Carrier/Top Roller

 
Specification For Carrier Roller
Product Describiton: Carrier Roller/Top Roller/Upper Roller
Application: Excavators
Model: PC200-8.EX100/ZX210-3
Material: 50Mn
Finish: Smooth
Color: Black/Yellow/Grey/Red/Other
Surface Hardness: HRC52-58
Hardness Depth: 8MM-12MM
Certification: ISO9000-2008
MOQ: 1
Supply Ability: 25000 Pieces Per Month
HS Code: 8431499900
Condition: New
Warranty: 12 Month
Place of Original: China(Mianland)
Package: Standard Export Fumigated Wooden pallet

Feature:
1)Our Carrier Roller,Top Roller,Upper Roller are adopting through hardening system and spraying quenching system while complying with the stringent ISO System.

2)We are able to assure the part has excellent wear resistance even in the most severe working conditions

3)We are using advance machining centre,horizontal and vertical CNC machining to execute processes such as machining, drilling, threading and milling to ensure the qulity and precision of each component to ensure the accuracy of assembly dimensions. This is to maximize the life span of each component and minimize production cost per hour.

4).Well lubricated oil recycle system

5). High hardness :HRC52-58,deepth:8mm-12mm

6). Deep hardened wear surface.

7). Good bronze bushings.

8).Undercarriage parts stock pictures will send before order.

9).All parts can check with part number,all parts can order follow part number.

10). Safe packing to protect the goods, such as wooden box,by tray.

11). Small quantity can accept.Sample order also accept.

12).Lifelong after-sales service.

13).Original /OEM /After Market quality and competitive price-2.Flexible payment terms.

14).Quick delivery time.

15).Exclusive agent accepted.

16).Have cooperated with many importers in us for more than 10 years.

17) Good metal fibrous tissue.

18) Resist abrasion and impact well.

19) Long life-expectation.

20) Good quality and competitive price.

21)We can provide customized products with special requirements.

22)Products sizeFollow OEM strictl.

23). One-stop service.

A.Full undercarriage parts of excavator and bulldozer are available: carrier roller/top roller track roller/bottom roller/lower roller, front idler, sprocket rim/segment group,

, track chain with shoes/track group.

B.Excavator spring assembly with OEM size, bucket link/H link, link rod/I link, track guard.

C.Ground Engaging Tools: bucket teeth, excavator buckets, cutting edge, and end bits

D.Hydraulic cylinder and seal kits: EX1200, PC1250 hydraulic cylinders are also available.

24). Factory direct price and Strict Quality Control.

We have our own factory and foreign trading office, attach much importance to items quality during the production and always check each goods before delivering.


PC200-8 Ex100 Zx210-3 Undercarriage Parts Excavator Carrier/Top Roller
Application Scenarios Of products
PC200-8 Ex100 Zx210-3 Undercarriage Parts Excavator Carrier/Top RollerPC200-8 Ex100 Zx210-3 Undercarriage Parts Excavator Carrier/Top Roller

PC200-8 Ex100 Zx210-3 Undercarriage Parts Excavator Carrier/Top Roller

Related Product
PC200-8 Ex100 Zx210-3 Undercarriage Parts Excavator Carrier/Top Roller

Production Process
PC200-8 Ex100 Zx210-3 Undercarriage Parts Excavator Carrier/Top Roller

1)After finishing the assembling process,fill in 80% of clean extreme-pressure vehicle gear oil and confirm no leaking 4 hours later.

2)The color of Carrier Roller,Top Roller,Upper Roller are per requested customers.

3) Track roller,Carrier Roller,Top Roller,Upper Roller, idler are mounted with long life well sealed Duo-cone floating ring well sealed Duo-cone floating ring seal.

About Us
1) We are manufacturer with an production experience for more than 12 years, and as foreign trader, we are experienced enough to help customers who lack internation trade experience, we will give you best advisement between cooperation.

2) Strict quality control before delivering;

3) With 4 forgingand and 8 casting production lines.

4) Factory Price without middleman spread.
PC200-8 Ex100 Zx210-3 Undercarriage Parts Excavator Carrier/Top Roller

Package & Shipping
PC200-8 Ex100 Zx210-3 Undercarriage Parts Excavator Carrier/Top Roller

PC200-8 Ex100 Zx210-3 Undercarriage Parts Excavator Carrier/Top Roller

After-sales Service
1) 24 hours for after-sales service;

2) Offer us picture of using situation,goods,using details, then compensation after everything is finished within 3 working days.

3) Any claim due to the quality of products,the compensation is not more than the value of the products that have quality problem.

FAQ
Q1:Are you a trade or a manufacure?
    A:We are an industry and trade integration business, our factory located on Quanzhou Nanan Distric.
Q2:How can I be sure the Excavator Parts will fit my excavator?
    A:Give us correct model number/machine serial number/ any numbers on the parts  itself.Or measure the parts give us dimension or drawing.
Q3:How about the payment terms for Excavator Parts?
    A:We usually accept T/T or L/C. other terms also could be negotiated.
Q4:What is your minimum order for Excavator Parts ?
    A:It depends on what you are buying. Normally, our minimum order is one 20' full container and LCL container (less than a container load) can be acceptable.
Q5:What is your delivery time for Excavator Parts ?
   A:FOB Xiamen or any Chinese port : 25-30days . If there are any parts in stock ,our delivery time is only 7-10 days. 
Q6:What about Quality Control?
   A:We have excellent tester, check every piece to ensure the quality is good,and strict control to ensure product safety into container.

Contact Us



 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours