Basic Info.
Model NO.
ASR2030
Double Igu
Available
Triple Igu
Available
Stepped Igu
Available
Shaped Igu
Available
Corner Wiper
Available
Freight
General Container
Transport Package
Seaworthy Package
Specification
2000*3000
Trademark
DETEK
Origin
China
HS Code
8464901900
Production Capacity
500sets/Year
Product Description
Auto sealing robot for insulating glass process.
Application
The secondary sealant sealing in Insulating Glass Units, ASR2030 is highly automatic silicone or polysulfide sealant sealing robot. Auto sealing robot guarantees the high quality of IGU for glass processing companies.
Feature
Parameter
Brand parts list
Mostly asked questions below:
1. What is your soonest lead time?
A: 60 days for whole production line, 30 days for single machine. Special requirement pls check with sales.
2. How do you arrange the shipment?
A: all machines fit GP for sea freight saving. Seaworthy package, workshop container loading, safe arriving.
3. Guarantee ?
A: One-year guarantee (wearing parts are out of this range). Life long service. DETEK will send engineers for service upon request onsite.
4. How we can install the machines?
A: Installation included; however, customers need to pay our engineer's round way air tickets, local transportation and accommodation (hotel and food).
The installation should be finished within 15 days, and will be charged 60USD/engineer/day.
5. How about the after service?
A: Spare parts within 72 hours.
Experienced technical sales sort out most of your questions.
Tens of service engineers ready for on-site service and instruction.
Application
The secondary sealant sealing in Insulating Glass Units, ASR2030 is highly automatic silicone or polysulfide sealant sealing robot. Auto sealing robot guarantees the high quality of IGU for glass processing companies.
Feature
- Economical and practical, used for glass deep processing company.
- Third section for finished IGu storage, increase production efficiency.
- Fully intelligent and friendly touching screen adopt Ethernet communication,, with memory function and easy operation.
- High sealing performance, high automation, reduce labor cost, improve production efficiency.
- Best sealing quality without air bubbles, smooth surface, save time for corner correction.
- Equipped with anti-blocking device in the mixer, easy to clean.
- Servo control system adopts world famous brand (Japan YASKAWA), performance is stable, and counting speed is fast, sealant output with high precision, surface with high smoothness.
- Special V type transmission belt to avoid sealant sticking on the belt, ensure the glass edge clean, V type block is changeable.
- Suitable for triple IGU sealing, shaped IGu is available(Option)
- Equipped with high speed positioning function, glass can be located accurately when conveyor fast.
- Keep machine service and upgraded timely with our own R&D department.
Parameter
Max. IGu size | 2000×3000mm |
Min. IGu size | 300×300mm |
IGu thickness | 12-56mm |
Power supply | 3P 380V 50HZ 7KW |
Air pressure | 0.6-0.8Mpa |
Max. squeeze pressure | 32Mpa |
Sealing speed | 5-40m/min |
Dimension | 8030×1400×2950mm |
Brand parts list
Name | Brand | Country |
PLC | Yaskawa | Japan |
Servo driver | Yaskawa | Japan |
Servo motor | Yaskawa | Japan |
Touching screen | WEINVIEW | Taiwan |
Inveter | TECO | Taiwan |
Breaker | Schneider | French |
Contactor | Schneider | French |
Relay | Schneider | French |
Sensor | AUTONICS | S. Korea |
Proximity switch | AUTONICS | S. Korea |
Reduction motor | YOUSHENG | SHANGHAI |
Solenoid | Airtag | TAIWAN |
Air cylinder | Airtag | TAIWAN |
proportional valve | SMC | Japan |
Fine regulator | SMC | Japan |
Mostly asked questions below:
1. What is your soonest lead time?
A: 60 days for whole production line, 30 days for single machine. Special requirement pls check with sales.
2. How do you arrange the shipment?
A: all machines fit GP for sea freight saving. Seaworthy package, workshop container loading, safe arriving.
3. Guarantee ?
A: One-year guarantee (wearing parts are out of this range). Life long service. DETEK will send engineers for service upon request onsite.
4. How we can install the machines?
A: Installation included; however, customers need to pay our engineer's round way air tickets, local transportation and accommodation (hotel and food).
The installation should be finished within 15 days, and will be charged 60USD/engineer/day.
5. How about the after service?
A: Spare parts within 72 hours.
Experienced technical sales sort out most of your questions.
Tens of service engineers ready for on-site service and instruction.